Horse Lake First Nation WTP
M2 Engineering assisted Horse Lake First Nation with full engineering services for a new water treatment plant.
Smoky River Raw Water Intake
The SRRWMC raw water intake had been exposed to severe flooding events that lead to the deterioration of the structure..
Village of Nampa Potable Water Reservoir
M2 Engineering assessed potable water storage requirements and prepared detailed design for a new reservoir.
Garden Meadows Reservoir Repairs
The Garden Meadows Reservoir is critical drinking water infrastructure for the City of Wetaskiwin and was showing signs of significant structural integrity failure.
Joussard Water Treatment Plant
With the increase in development, the community has experienced an increase in water demands which put stress on the existing water treatment infrastructure.
Fawcett RO Membrane Integration
M2 Engineering developed a plan to overcome disinfection process challenges that were caused by naturally occurring ammonia in the source water. Our services included piloting a Reverse Osmosis (RO) pilot plant to reduce ammonia levels and improve disinfection.
Kinuso Reservoir and Pump Station
The existing Kinuso reservoir and pump station had surpassed its life expectancy and was in need of a replacement.
Dease River First Nation
Water & Wastewater Feasibility Study
M2 Engineering’s Feasibility Study assessed existing systems, developed upgrade/retrofit options, and provided recommendations to establish a foundation for future design phases.
Pickardville Pumphouse Upgrades
M2 Engineering evaluated the upgrade needs of the facility, prepared detailed design drawings and provided construction support services.
City of Wetaskiwin
Wastewater Lagoon Action Plan
M2 Engineering developed an immediate action plan to assist the City with ongoing wastewater effluent quality issues.
City of Wetaskiwin
Wastewater Feasibility Study
M2 Engineering assessed the City’s existing wastewater systems and provided upgrade options for a new wastewater treatment facility.
Town of High River
Lift Station No. 1 Upgrades
M2 Engineering supplemented McElhanney’s project team for the pre-design, detailed design and major equipment procurement of the screening and conveyance components of the lift station upgrade project.
NEW water Limited Regional Water Study
NEW water Limited’s Regional Water System is complex. The Regional Water Study assisted in understanding the future needs of both current and future planned users to help plan upgrade of the existing regional water treatment plant.
M.D. of Opportunity Water & Wastewater Inventory Assessment
The Inventory Assessment Project collected data on over 40 water and wastewater assets to help centralize information and aid in future planning.
Town of Peace River
Drinking Water Safety Plan Assistance
M2 Engineering assisted the Town with the development of their first Drinking Water Safety Plan.